Desktop|中文
Home About Us Products + News Center Technical Articles Messages Contact Us

Product Details

全自动Dielectric Loss Tester-扬州达瑞

Transformer Ratio and Group Tester - Yangzhou Darui

Published: 2020-08-24 08:48:46

Views: 2922

Category: Transformer Ratio

Product Description
Transformer Ratio and Group Tester 

Darui Electric recommends:


Using a transformer ratio bridge to measure the transformer ratio involves a cumbersome operation process and a narrow measurement range, which no longer meets the fast-paced and high-efficiency requirements of modern measurement. To this end, our company has developed a new generation of transformer ratio and group tester using modern electronic technology. It is small in size, light in weight, high in accuracy, and good in stability. It features a large-screen Chinese character display, menu operation, and a user-friendly interface. The ratio and group can be measured in one go. This instrument is an ideal testing instrument for the power industry.

Functional Features

1. Automatically measure the connection group.

2. Automatically change the group.


3. Automatically switch phase sequence.


4. Automatically switch range.


5. Automatically calibrate the meter.


6. After inputting the standard ratio, it can automatically calculate the relative error.


7. After one measurement is completed, the test voltage is automatically cut off.


8. The set data and measurement results are automatically saved, and previous data can be viewed.


9. For measuring on-load transformers, only input the ratio once.


10. Equipped with a serial R232 interface.


11. Equipped with a micro printer, which can also directly print out the data results.


Technical Indicators

 


2. Group: 1—12 points


3. Accuracy: 1-1000 0.2 class, 1000-10000 0.5 class


4. Power supply: AC220V ±10%, 50HZ


5. Operating ambient temperature: -5℃ ─ 40℃


6. Operating ambient humidity: <85%


7. Volume: 430×320×215mm3


8. Weight: 8Kg



2. If the test leads are short-circuited or the high and low voltage connections are reversed, the fuse will blow. After the fuse blows, if measurement is attempted, it will display "Measuring, please wait!"Stop. Please power off, replace with a fuse of the same capacity, and retest.


3. Keep the connections in good contact. The instrument should be properly grounded!


4. The working place of the instrument should be far away from strong electric fields, strong magnetic fields, and high-frequency equipment. The smaller the interference of the power supply, the better. It is advisable to use lighting lines. If the power supply interference is still large, an AC purified power supply can be used to power the instrument. The capacity of the AC purified power supply should be greater than 200VA.
WeChat QR Code
💬
💬 Message ✕

Hello! Have you found what you need? Contact us directly online!

Leave a Message for Consultation
Yangzhou Darui Electric Co., Ltd.
主营产品:Dielectric Loss Tester、Transformer Ratio测试仪、Loop Resistance Tester、高压None线核相仪、Insulation Resistance Tester、Partial Discharge Tester、Cable Fault Tester、DC Resistance Tester等。
☎ Phone: 18952707000(关经理)📞 Landline: 0514-88770377✉ Email: 195214804@qq.com
Verification Code
By submitting, you agree to ourTerms of ServiceandPrivacy Policy
🏠 网站Home📞 一键拨号✉ Contact Us