Desktop|中文
Home About Us Products + News Center Technical Articles Messages Contact Us

Product Details

全自动Dielectric Loss Tester-扬州达瑞

1A Transformer On-Load Tap Changer Tester - Yangzhou DARUI

Published: 2020-08-24 17:04:30

Views: 2922

Category: OLTC Tester

Product Description


1A Transformer On-Load Tap Changer Tester 


DARUI Electric recommends:



Performance Features



1. Capable of measuring transition waveform, transition time, transition resistance, three-phase synchronization, and other parameters.



2. Dot-matrix LCD screen with hierarchical Chinese menu for simple and quick operation.



3. Intelligent testing and result analysis, with zoom in/out of waveform test results.



4. Three independent stabilized voltage sources suitable for no-winding measurement; three independent constant current sources suitable for both with-winding and no-winding measurements.



5. Six independent signal processing channels, high-speed A/D conversion, 10KHz high-speed sampling to reflect parameter changes.



6. Built-in non-volatile memory can store three sets of waveforms and data, allowing archiving, retrieval, and analysis.



7. Built-in perpetual calendar displays date and time, with automatic printing capability.



8. Equipped with a high-speed printer to print test results.



Product Introduction:



According to the principles of the "Regulations for Handover and Preventive Tests of Power Equipment" and related specifications, this comprehensive measuring instrument is used to measure and analyze the electrical performance indicators of on-load tap changers in power transformers and special transformers within the power system. It is controlled by a computer and uses a specially designed measurement circuit to measure parameters such as transition time, transition waveform, transition resistance, and three-phase synchronization of on-load tap changers. With a brand-new testing principle and microcomputer technology, it allows testing of the performance of on-load tap changers in various power transformers without disassembling or lifting the switch on site, displaying and printing transition waveforms and parameters. Depending on requirements and site conditions, measurements can be taken directly from the tap changer leads, or directly connected to the three-phase bushings and neutral point of the transformer.



Precautions



1. Read the manual carefully before using the instrument.



2. Operators should have general knowledge of electrical equipment or instruments.



3. It operates normally within an ambient temperature of -5°C to 40°C and relative humidity ≤80%, but when used outdoors, avoid rain and direct sunlight on the LCD screen.



4. Turn on the power switch only after all test leads are properly connected.



5. After testing, wait for discharge to complete before removing test leads.



6. Do not move test clamps during testing.



7. If the current is too low, connect two or more wires in parallel as one measurement path, and short-circuit unused wires with the black wire.



8. The power socket has a protective ground wire; plug into a three-hole grounded outlet.



Note: The above information and technical parameters are compiled and released by Yangzhou DARUI Electric Co., Ltd.


WeChat QR Code
💬
💬 Message ✕

Hello! Have you found what you need? Contact us directly online!

Leave a Message for Consultation
Yangzhou Darui Electric Co., Ltd.
主营产品:Dielectric Loss Tester、Transformer Ratio测试仪、Loop Resistance Tester、高压None线核相仪、Insulation Resistance Tester、Partial Discharge Tester、Cable Fault Tester、DC Resistance Tester等。
☎ Phone: 18952707000(关经理)📞 Landline: 0514-88770377✉ Email: 195214804@qq.com
Verification Code
By submitting, you agree to ourTerms of ServiceandPrivacy Policy
🏠 网站Home📞 一键拨号✉ Contact Us