Desktop|中文
Home About Us Products + News Center Technical Articles Messages Contact Us

Product Details

全自动Dielectric Loss Tester-扬州达瑞

Transformer On-Load Tap Changer Tester Parameters - Yangzhou DARUI

Published: 2020-08-24 16:14:18

Views: 2922

Category: OLTC Tester

Product Description
Transformer On-Load Tap Changer Tester Parameters 

DARUI Electric recommends for you:


Instrument Purpose

This instrument is mainly used for waveform analysis and parameter testing of on-load tap changers in power transformers. It can measure the transition waveforms of on-load tap changers in transformers with or without windings, and automatically analyze transition time, transition resistance, and three-phase asynchrony.

When the three-phase asynchrony exceeds a certain range, it will generate a large interphase circulating current. In a very short time, one contact has to bear the current of two branches, exceeding its current-carrying capacity, causing arcing during the switching process and burning the switch. Abnormal transition resistance (first, transition resistance fracture; second, severe burning and wear of the moving and static contacts of the diverter switch, with serious wear on the contact surfaces; third, poor connection of the transition resistance) may lead to a vicious cycle during voltage regulation, potentially causing sudden accidents such as transformer tripping during operation. Abnormal transition time, for example, if the time before three-phase bridging is long, indicates that the energy storage spring of the quick mechanism is aging and the speed is relatively slow. Generally, for transformer on-load tap changers, the phase-to-phase difference is ≤2ms for double resistors and ≤5ms for four resistors. For autotransformer on-load tap changers, the phase-to-phase difference is relatively large; generally, over 100 milliseconds is normal.



Technical Parameters

1. Three independent test power supplies, maximum output current 0.5A;

2. The instrument sets the sampling rate to 10-20 kHz;


3. Maximum storage time for a single waveform is 6.4 seconds.


4. Transition resistance measurement range: for Y/0 type transformers, 1-40Ω,


for Y type transformers, 1-20Ω.


5. Measurement accuracy: 1-5Ω, Δ=±10%


5-40Ω, Δ=±5%


6. Time and synchronism error: Δ≤±1%.


7. Display: 240×128T, T6963C controller;


8. Printer: MP-40-8 panel-mounted front paper-loading printer;


9. Processing part:


80C320 high-speed 8-bit microprocessor. Program memory 32K;


Power-off data retention memory 512K bytes;


High-speed A/D converter, maximum sampling rate up to 400 kHz;


10. Power supply: 220V ±10%, power ≤200W.


11. Dimensions: 410mm×320mm×200mm.


12. Weight: ≤5kg




Note: The above information and technical parameters are compiled and released by Yangzhou DARUI Electric Co., Ltd.



WeChat QR Code
💬
💬 Message ✕

Hello! Have you found what you need? Contact us directly online!

Leave a Message for Consultation
Yangzhou Darui Electric Co., Ltd.
主营产品:Dielectric Loss Tester、Transformer Ratio测试仪、Loop Resistance Tester、高压None线核相仪、Insulation Resistance Tester、Partial Discharge Tester、Cable Fault Tester、DC Resistance Tester等。
☎ Phone: 18952707000(关经理)📞 Landline: 0514-88770377✉ Email: 195214804@qq.com
Verification Code
By submitting, you agree to ourTerms of ServiceandPrivacy Policy
🏠 网站Home📞 一键拨号✉ Contact Us